Saturday 8 March 2014

Hot Tub Make Over

The spa is finally getting close to completion. The old plaster was blasted out, new bead Crete put in and now the water is in. In a couple of days they will check that everything pumps correctly and then we should be good to go!!  Yahoo!!

The deck is almost done too. All we need now is for Lorenzo, the concrete guy, to do the decorative acrylic concrete along the rim of the spa. 

Old interior plaster is blasted out.
New water line tile is in place.

Preparing to put in bead crete.
Plastic is taped in place to protect surrounding areas.

Putting on bead crete and tile being grouted at the same time!
(Two different crews.)

Grout work being done on the raised deck area.

Bead crete in, grouting done, and a bit of peace and quiet!

A look at the overall effect.  

Spa with water in it.
(Only the spa surround of decorative acrylic concrete left to do.)

No comments:

Post a Comment